Roll picker
How-to, install

How to install roofing felt

Roofing felt goes on fast once you know the order: drip edge at the eaves, ice barrier where needed, felt from the bottom up, drip edge on the rakes. The laps do the work, so keep them straight and keep the felt flat.

As an Amazon Associate we earn from qualifying purchases. How this site earns. We have not tested these products; see how we choose.

Updated October 12, 2026Research based, not hands-on testing

2 in top lap4 in end lap, staggeredstart at the eave
Fig. 1 Felt courses from the eave up: top laps of about 2 inches, end laps of about 4 inches, staggered.

Short answer

Start at the eave and roll the felt horizontally, each course lapping the one below by at least 2 inches and end joints by 4 inches (TAMKO’s numbers for felt under its roll roofing). Fasten it flat with cap nails or the fasteners your code allows, staggered and close enough that wind cannot lift it. Lay ice barrier at the eaves first where required, and cover the felt with roofing soon: it is not made for long exposure.

Before you start

Pick the underlayment: #15 or #30 felt, synthetic, or self-adhered in leak prone spots. Felt wrinkles when wet and tears in wind, so plan to cover it with roofing the same day or soon after (Fine Homebuilding).

What you need

  • Roofing felt #15 for most jobs; #30 for more exposureFind it
  • Cap nailsFind it
  • Hammer tacker where staples are allowedFind it
  • Drip edgeFind it
  • Ice and water shield eaves and valleys where requiredFind it
  • Chalk line, tape measure, utility knifeFind it

How to install roofing felt, step by step

  1. Clean and check the deck

    Sweep the deck, drive or pull raised nails, and replace soft or damaged sheathing. The felt will show every bump.

  2. Fit drip edge at the eaves

    Nail metal drip edge along the eaves so the felt can lap over it.

  3. Lay ice barrier where required

    In ice dam areas, run self-adhered ice barrier from the eave to at least 24 inches inside the exterior wall line, measured horizontally. On most roofs that is two rows (Fine Homebuilding). Line valleys too.

  4. Snap a line for the first course

    Snap a chalk line one roll width up from the eave (less any overhang you want) so the first course runs straight.

  5. Roll out and fasten the first course

    Roll the felt along the line, keep it flat and free of wrinkles, and fasten it along the top and edges. Use cap nails or the fasteners your code allows, closely enough that wind cannot lift it.

  6. Lap each course above

    Work up the roof, lapping each course at least 2 inches over the one below. Where rolls end, lap them 4 inches (TAMKO) and stagger the end laps from course to course. Most felts have printed lines to guide the lap.

  7. Lap over the ridge and at valleys

    Carry each side over the ridge so the felt laps the other side. In valleys, run felt over the valley lining as your roofing maker’s detail shows.

  8. Fit drip edge on the rakes

    Install rake drip edge over the felt so water that runs off the felt goes over the metal, not behind it.

  9. Cover it with roofing

    Install the roofing as soon as you can. Felt is not made to face the weather for long.

Low slopes need more

On low slopes, one layer of felt can let wind driven water back up under laps. DECRA suggests two layers lapped about 19 inches on 3 in 12 to 4 in 12 roofs (DECRA), and shingle makers and codes have their own low slope rules. Check your roofing maker’s instructions and local code before you buy.

Next step: lay the roofing with how to install roll roofing.

Questions people ask

Which way does roofing felt overlap?

Like shingles: each upper course laps over the course below, so water running down the roof always runs over a lap, never into one. Start at the eave and work up.

How much should roofing felt overlap?

TAMKO’s roll roofing instructions call for at least 2 inches at the top laps and 4 inches at end laps. Some shingle makers and codes call for more, and low slopes can call for double coverage. DECRA suggests two layers lapped about 19 inches on slopes of 3 in 12 to 4 in 12.

Should I use staples or nails for felt?

Cap nails hold felt best and resist tearing in wind. Many codes and makers allow staples for felt; synthetics generally need cap nails or cap staples. Follow your local code and the underlayment label.

Does felt go over or under the drip edge?

The common order is drip edge on the eaves first with underlayment over it, and underlayment on the rakes first with drip edge over it. That way water always runs over each piece. Check your roofing maker’s detail.

How do I apply roofing felt adhesive?

Felt under roofing is normally fastened, not glued. Where an ice barrier is built from two layers of felt cemented together, or where a maker calls for cemented laps, use the asphalt cement the instructions name in thin even coats.

See roofing felt on Amazon

Sources

  1. Fine Homebuilding, Synthetic roofing underlayments
  2. OSHA, Portable ladder safety QuickCard
  3. Fine Homebuilding, Ice barriers explained: how far up the roof slope?
  4. TAMKO, Fiberglass slate surface roll roofing application instructions (maker)
  5. DECRA, Understanding roof underlayment (maker guide, PDF)

Last reviewed October 12, 2026. Products and listings change; check the data sheet and wrapper before you buy, follow the maker’s instructions, and check your local building code.